| |
SUNGAI
HARMONI OPERATIONS |
| |
|
|
Management, operation and maintenance of the water treatment
facilities under Sungai Selangor Phase 1 (SSP 1) that currently
supplies to large areas of Kuala Lumpur, Petaling Jaya, Klang,
Kuala Selangor, Kuang and Kundang.
SSP1 is one of the biggest Malaysia’s water treatment
plant (Nominal Design Capacity of 950 MLD). Indeed, this
was a milestone in achievements for Taliworks to be entrusted
with the responsibility of running this facility. |
| |


|
SSP1 was conferred with
MS ISO 9001:2000 Quality Management Systems - Requirements
(OPERATION AND MAINTENANCE OF WATER TREATMENT PLANT)
accreditation on 21 March 2003. Before that, in October
2000, the SSP1 Laboratory was conffered with the Seal
of Accreditation (ISO/IEC Guide 25) by Department of
Standards Malaysia under the National Laboratory Accreditation
Scheme (SAMM). The SSP1 Laboratory was subsequently elevated
to the ISO 17025 accreditation in October 2002.
In line with the commitment to water quality
excellence, Sungai Harmoni has continued to carry out a
comprehensive set of water quality testing of the treated
water to ensure compliance with water quality standards
at all times. It has, on its own accord, instituted a surveillance
programme to monitor the raw water quality in the Sungai
Selangor catchments upstream of the intake on a quarterly
basis; this is to be forewarned of potential changes in
the raw water quality that may require adjustments to the
treatment regime. |
|
| |
| Backed by the most modern water treatment
technology and computer-based telemetry monitoring of process
data, this facility produces treated water, that complies
with the quality standards of the Malaysian Ministry of Health
and the World Health Organisation. |
| |
 |
| |

|
| |
 |
| |
|
 |
 |
 |
|
 |
 |
 |
| In October 2000, we were conferred with
the Seal of Accreditation (ISO/IEC guide 25) by the Jabatan Standards
Malaysia.... more |
|
 |
|